Pre-Construction & Feasibility 

Pre-Construction Estimating & Budget Feasibility

We provide the forensic cost modeling, constructability roadmaps, and municipal permitting strategies required to align your vision with financial reality before capital is deployed.

Plan Review

Detailed Budgets

Itemized Estimate

Bank Readiness

LEAN Construction

What Pre-Construction Solves

Subterranean &
Geotechnical Uncertainty

  • The Issue: Sub-surface anomalies, unstable soil, or unknown utility encumbrances that lead to massive change orders during excavation.

  • The Solution: We lead a forensic site discovery phase, reviewing Geotechnical (Soil) Reports and utility surveys to identify subterranean risks. By verifying site conditions early, we ensure your foundation and site-work budgets are grounded in reality, not assumptions.

Design-Budget Disconnect
(Budget Creep)

  • The Issue: Receiving a bid at 100% Construction Drawings that is 20% over your pro forma, forcing a costly and time-consuming redesign.

  • The Solution: We perform Continuous Cost Modeling starting at the Conceptual and Design Development (DD) phases. Our team provides real-time pricing feedback and Value Engineering (VE) alternates, allowing you to make design decisions that protect your ROI without sacrificing asset quality.

Long-Lead Supply Chain
Bottlenecks

  • The Issue: Waiting until groundbreaking to order MEP equipment, only to find a 40-week lead time on critical electrical gear or HVAC units.

  • The Solution: We identify "Schedule-Sensitive" materials during the first 14 days of pre-con. Our team develops a Long-Lead Procurement Register, allowing developers to secure production slots and lock in pricing early to protect the opening date.

Regulatory Bottlenecks

  • The Issue: Project delays caused by a lack of clarity on Central Texas site-plan approvals or Florida-specific wind-load and CGC compliance requirements.

  • The Solution: We integrate municipal milestone tracking into your master schedule. Whether navigating Austin’s impervious cover limits or Florida’s HVHZ high-velocity hurricane zone standards, we ensure permitting strategies are aligned with your target groundbreaking date.

Fragmented Trade Buyout
(Scope Gaps)

  • The Issue: "Apples-to-oranges" bidding where trade partners leave out critical scope items, resulting in budget gaps discovered mid-build.

  • The Solution: Our team conducts rigorous Bid Leveling. We forensicly review every trade proposal against the master scope to ensure total coverage. We document all Assumptions & Clarifications within Procore, providing you with a high-fidelity budget ready for GMP conversion.

Data-Driven Roadmaps for Institutional Development

ROM & Conceptual Estimating.png

ROM & Conceptual Estimating

We establish a high-fidelity "Order of Magnitude" budget based on your Conceptual or SD (Schematic Design) sets to verify project feasibility early.

Value Engineering Icon.png

Value Engineering (VE) Matrix

A structured options analysis proposing material and method alternates that maintain quality while protecting the project's pro forma.

Bid Levling Icon.png

Bid Leveling & Scope Forensic

Forensic comparison of trade partner proposals to identify scope gaps and ensure an "apples-to-apples" buyout process before GMP conversion.

Long Lead Time Icon.png

Long-Lead Procurement 

Early identification of schedule-sensitive MEP equipment (switchgear, transformers, HVAC) to secure supply chain slots and lock in pricing.

CPM Master Scheduling Icon.png

CPM Master Scheduling

Establishing the "Project Pulse" through Critical Path Method (CPM) logic, identifying early-access milestones and trade handoff sequencing.

Site Staging & Logistics Plan Icon.png

Site Staging & Logistics Plan

High-fidelity mapping of crane placements, material staging zones, and trade access paths for urban-infill and multi-pad developments.

Constructability Review.png

Constructability Report

A multi-disciplinary forensic review of architectural and MEP sets to identify design clashes before field mobilization.

GMP Icon.png

GMP Contract Readiness

Transitioning finalized Design Development (DD) sets into a Guaranteed Maximum Price (GMP) contract with documented assumptions.

Planning a Buildout? Let's Run the Numbers.

From preliminary budgeting to full GC services, we provide the technical discipline your project deserves.